Well, here is Mary, Joseph and Jesus, will carry on with the rest of the figures next year ready for next Christmas, hope you all have a good Christmas.
Monday, 24 December 2007
Saturday, 22 December 2007
2 days to go..
and nativity is coming along nicely. Mary, Joseph and Jesus are knitted, just need minor surgery to attach arms and hands. Hopefully I will post pics by 25th
Knitting has been slow this week due to my kids generously sharing their cold germs with me, think I got 2 sets of germs as was just getting over the cold when another one came.
I am now concentrating on knitting gloves and scarves, we had a frosty week and have loads of gloves, sadly not many pairs so going to sort out the mismatched ones and knit new sets.
Knitting has been slow this week due to my kids generously sharing their cold germs with me, think I got 2 sets of germs as was just getting over the cold when another one came.
I am now concentrating on knitting gloves and scarves, we had a frosty week and have loads of gloves, sadly not many pairs so going to sort out the mismatched ones and knit new sets.
Friday, 7 December 2007
hipknits project club
Got the next parcel in this on Monday, 100g sock yarn and a hank of sarisilk. The sarisilk knitted up into this hat.
and this is the socks so far
Saturday, 1 December 2007
bye bye NOvember
Yes, I completed NOvember, no new projects cast on last month at all, though very little finished, (bayerische and gloves and scarf to match the dinosaur hat), just closer to finishing 2 shawls and a cardi. I am going to cast on something new soon, going to knit a nativity, I have been thinking about doing one for at least 20 years but now have loads of leftovers to use. Still deciding which pattern to use, Jean Greenhowe or one from Simply kintting last year but have decided that this is the year it gets made. Hoping to get at least Mary, Joseph and Jesus done so watch this space.
Sunday, 18 November 2007
Finished bayerische
Saturday, 17 November 2007
My first VLT project blocked
Finished the scarf a while ago but finally blocked it this week, gace it to a friend as a present and she was pleased with it.
I also finished the bayerische socks today, but too dark for photos, so hope to have those done this week.
Now going to try and finish at least one of my shawls before this month ends.
Tuesday, 13 November 2007
Still knitting
well. now halfway down the foot of the bayerische socks, the end is in sight!!! Hopefully will finish this weekend
Up to row 140 on Della, and blocked the VLT scarf that was finished ages ago, also knitted 2 pairs of gloves for a swap, getting posted tomorrow so no pics of them until they arrive, should have some pictures to show soon.
Up to row 140 on Della, and blocked the VLT scarf that was finished ages ago, also knitted 2 pairs of gloves for a swap, getting posted tomorrow so no pics of them until they arrive, should have some pictures to show soon.
Tuesday, 6 November 2007
NO-vember update
Well, i am still resisting the lure of new projects, and making good progress on bayerische, now up to the heel on the second sock and really enjoying it, so hopefully should be finished this month. I have also done another pattern repeat on the wildflower shawl and more of the einstein coat, and am going to do 2 rows a night of Della so hopefully should make some progress.
Thursday, 1 November 2007
NO-vember
Seeing as its the start of the month I have decided that November is the month where I start no new knitting but finsh all my other projects first, hence the title.
So this month I will be knitting
So this month I will be knitting
- Della shawl, currently on row 126
- wildflower shawl (halfway through)
- Einstein coat (10% done)
- Bayerische socks (1 done)
- Great american aran afghan (1 1/2 squares done)
- balaclava for son
Hopefully some of these will be finished this month
Monday, 29 October 2007
Ravelry - I'm in
Got my invite last week, so been having a nosy on there, along with having loads of college work to do, so not much knitting at present. Theres a definate nip in the air here now, and fresh snowfall on the hills so need to start on the winter woolies.
Saturday, 20 October 2007
Miss Potter mitts
Thursday, 18 October 2007
Grr Dinosaur
Friday, 12 October 2007
ccc back complete
Tuesday, 9 October 2007
Wildflower shawl
Tuesday, 25 September 2007
Still knitting
Havent posted for over a week but still here and knitting away. Finished the back of the modular cushion, but no batteries in the camera for pictures. Nearly finished the VLT scarf (on second border) and done a square of the american aran afghan. Also college has started in earnest so got to study as well as knit. Hope to get new batteries soon and post progress pics.
Saturday, 15 September 2007
I've started Della
Thursday, 13 September 2007
CCC is finished
Sunday, 9 September 2007
My first toe up socks
Saturday, 8 September 2007
Baby knits
Did this baby cardi and hat for a friends wee girl, yarn used was James C. Brett Marble DK, lovely to knit with, and cardi pattern is the wee einstein cardi from 'The Knit Stitch' by Sally Melville. Going to make myself the ladies version for winter. I've also been knitting socks, will post pics tomorrow, but knittings been slow as caught an awful cold/ sore throat from kids.
Sunday, 2 September 2007
I can steek!!!!
Diane M on the AY forum kindly did a tutorial on steeking (cutting holes in knitting for armholes etc) This is my sample and also my first attempt at fairisle too.
Here is the sample after cutting, the edge was neatened with crochet prior to cutting.
This is the edge that was cut then neatened with blanket stitch, it unravelled a bit but the stitching has hald it in place, i've given it a good tug and stretch and it hasnt unravelled.
And finally here is an update on the modular cushion, now done 14 shapes.
Saturday, 1 September 2007
Mystery knitting
Well, ms3 is finished and blocked, here is a picture as modelled by a coathanger,and I've now joined another mystery knit, this time its a cushion in modular knitting organised by woolly thoughts, now up to clue 8. sewingnoddy told me about it.
Monday, 27 August 2007
Bank holiday Challenge update
Well, heres how I got on.
My DD got a new top made for school,
Made a pair of gloves for my friends birthday
and I finished MS3 (had nearly all of clue 7 to do) Now I'm going to try to finish a cardi for my friends wee girl while I have the urge to finish things.
And yes mum, I did do the housework too!!
Friday, 24 August 2007
Bank holiday challenge
The folks on the crafty yarns and threads forum have set a challenge to make a garment in a weekend. I have decided to make fetching from knitty and to sew a top for DD for school. Both need doing asap, the gloves are for a friends birthday next week and DD has been back at school for 2 weeks. Come back monday evening to see if I was successful.
The tangled skein took all weekend to unwind, and I have now worked 20 rows of shawl, will post pic next week.
The tangled skein took all weekend to unwind, and I have now worked 20 rows of shawl, will post pic next week.
Saturday, 18 August 2007
Look what the postie brought
Well, I was sitting there this morning winding (by hand) the skein from the hipknits project club when postie knocked on the door. I had a parcel, Angel Yarns forum have organised a dishcloth swap and this is what I got. Thanks stuffie.
Here is a close up of the pattern.
The downside is that I had to put my skein down, my son had a look and it now looks like this.
The downside is that I had to put my skein down, my son had a look and it now looks like this.
Guess what I will be doing for the rest of the day.
Thursday, 16 August 2007
Talented Daughter
My oldest son was 11 on Tuesday and DD offered to decorate the cake, she picked a pokemon theme and drew it freehand using writing icing, then painted the colours with food colouring. DS1 was most impressed. Seemingly its a space virus rare pokemon.
On a knitting theme, I have finished my sons socksHe insisted that I match the stripes too, normally I dont bother, what do all you sock knitters do, match or not?
I also started a scarf from VLT in malabrigo lacewieght, pattern is victorian ruby. Its for a friends birthday.
Saturday, 11 August 2007
Finally nominated
Decided to nominate http://www.yarnstuff.blogspot.com/ for a rocking girl blogger award, not only does she do this blog but also did a great one about being backup for a runner in extreme racing. I found it entertaining even though i am totally non sporty.
Knittings been on the backburner this week as I have been helping with crafts at Kilmallie Free Church holiday club. We had over 60 kids each afternoon and the theme was based on the story of Joseph, it was a very enjoyable week.
Knittings been on the backburner this week as I have been helping with crafts at Kilmallie Free Church holiday club. We had over 60 kids each afternoon and the theme was based on the story of Joseph, it was a very enjoyable week.
Monday, 6 August 2007
Thanks Linz
Just been nominated by Linz for a rocking girl blogger award, Thanks for this, especially as i have been blogging for such a small time, though been posting on forums for longer. Now got to try and work out how to get the button in my sidebar, and how to link to other peoples posts. Will let you know tomorrow who I nominate, will sleep on it first.
Friday, 3 August 2007
Socks, socks, socks
Thought i'd show you the socks I have on the needles at the moment . First up are socks for my son in Sirdar Town and Country, using a basic sock pattern.
Next is bayerische, knitted as part of a sockathon on the Angel Yarns Forum
And finally my first ever toe up sock, 'falling in love' from magknits, using Posh Yarn for the first time
Hoping to get at least one pair finished this month to enter in the sock a month challenge on the Crafty threads n yarns forum.Wednesday, 1 August 2007
Rainbow star
Tuesday, 17 July 2007
MS3 clue 3
Sunday, 15 July 2007
zippy socks
Sunday, 8 July 2007
Saturday, 7 July 2007
My first Booga bag
Tuesday, 3 July 2007
yarn spree
Went shopping today for fabric, and while there got 6 balls of DK for mindless summer crochet, one ball each of red, orange, yellow, green, blue and purple. Yes, I'm making a rainbow throw for DS2. wanted something to do while watching kids, and MS3 is a bit too intricate for that. No pics as camera batteries dies, now recharging them.
Saturday, 30 June 2007
MS3 beginnings
Thursday, 28 June 2007
Opal rainforest socks
Finished these today after a break, so long a break that I sat down yesterday halfway through the second sock and thought I'd look at the first to see how much longer to make it, only to discover I'd lost the first sock. Panic and frantic tidying followed, finally found the first sock so now I have a pair.
Saturday, 23 June 2007
Baby Albert coat
Monday, 18 June 2007
Another WIP finished
Sunday, 17 June 2007
Queen of the waves is blocked!!
Saturday, 16 June 2007
Queen of the Waves is finished
Friday, 15 June 2007
Even more shawl knitted
Thursday, 14 June 2007
decisions, decisions
Tuesday, 12 June 2007
more progress pics
Monday, 11 June 2007
progress so far
Wel as mentioned the other day, making Queen of the Waves, getting on quite well with it, heres progress so far.
The shading in the yarn is starting to become more clear, unfortunately just after taking this picture I discovered a dropped stitch 10 rows down but managed to save it with a crochet hook. Phew!!!!
Subscribe to:
Posts (Atom)