Sunday 18 November 2007

Finished bayerische


Finished these at last only to discover that I had cabled the other way round on the second sock. Hopefully its not too noticable in everyday life.

Saturday 17 November 2007

My first VLT project blocked


Finished the scarf a while ago but finally blocked it this week, gace it to a friend as a present and she was pleased with it.
I also finished the bayerische socks today, but too dark for photos, so hope to have those done this week.
Now going to try and finish at least one of my shawls before this month ends.

Tuesday 13 November 2007

Still knitting

well. now halfway down the foot of the bayerische socks, the end is in sight!!! Hopefully will finish this weekend
Up to row 140 on Della, and blocked the VLT scarf that was finished ages ago, also knitted 2 pairs of gloves for a swap, getting posted tomorrow so no pics of them until they arrive, should have some pictures to show soon.

Tuesday 6 November 2007

NO-vember update


Well, i am still resisting the lure of new projects, and making good progress on bayerische, now up to the heel on the second sock and really enjoying it, so hopefully should be finished this month. I have also done another pattern repeat on the wildflower shawl and more of the einstein coat, and am going to do 2 rows a night of Della so hopefully should make some progress.

Thursday 1 November 2007

NO-vember

Seeing as its the start of the month I have decided that November is the month where I start no new knitting but finsh all my other projects first, hence the title.
So this month I will be knitting
  • Della shawl, currently on row 126
  • wildflower shawl (halfway through)
  • Einstein coat (10% done)
  • Bayerische socks (1 done)
  • Great american aran afghan (1 1/2 squares done)
  • balaclava for son

Hopefully some of these will be finished this month